Demineralised water production to compensate the loss of condensate polluted with sea water

The Client Needs
The client contacted Mobile Water Solutions to set up a temporary production unit of water for the rehabilitation of local storage of the two chains of demineralisation on their steel site in South of France.
The initial contract was for a 2 week period however due to delays on site the rental period was extended week per week for a period of 6 months.

Our Solution
Mobile Water Solutions supplied the following technology:

  • MOPS 140/6i + MOFI 3×60 + MORO 4X25 double pass + 2 MOFI1200 series.
  • In addition we provide an emergency response service through Veolia Water to ensure intervention within 2 hours of a reported fault via SMS.

The Benefits

  • Process Capacity: a continuous supply of 80m3/h
  • Rapid Response: Onsite within days of enquiry