Demineralised water production on a nuclear power station.

The Client Needs
A French nuclear power station needed to carry out improvement works to its water treatment plant. During these works, the customer needed a temporary demineralised water production plant at the site for 2 or 3 weeks. This customer used reverse osmosis water before their demineralisation plant to increase the ion exchange plant cycle. The reverse osmosis asset came complete with pretreatment.

Our Solution
Mobile Water Solutions provided:

  • Submerged inlet pump in river water
  • UF 140 m³/h
  • Tank of 70 m³ capacity
  • MOPS 170/7i
  • MORO 4×25 T – 100 m³/h
  • Chemicals

The Benefits

  • Rapid response
  • No downtime to operations
  • No chemical handling – resin regeneration off-site
  • 24/7 service provided